A planning application has been lodged for an extractive industry on the abovementioned lot. The proposal includes:
– The extraction of lateritic gravel for road building;
– A total extraction area of 3.8 hectares, on cleared land, that will be worked in 1 hectare cells. There will be one 1 hectare cell open at a time, and each cell will be rehabilitated and returned to pasture before the next cell is opened;
– The extraction area is shallow with digging to an approximate depth of 0.9 metres below the surface;
– Processing will be done on site using a mobile plant. A tractor-mounted crusher works the gravel in the ground to about 400 mm per pass and lays it back down, ready to be lifted to stockpile. A mobile screen is added only when an order needs a set grading;
– There is no fixed plant, no washing and no water used in the process;
– Topsoil, overburden and product gravel are stockpiled within the working cell only. Nothing is stored outside it;
– The hours of operation are proposed to be 7:00 am to 6:00 pm Monday to Friday, and 7:00 am to 5:00 pm Saturday. No operation will occur on Sundays or Public Holidays;
– There will not be any permanent staff on site. 2 to 3 staff will be on site during supervised extraction works;
– Transport will include the use of trucks with a typical load of approximately 12m3. Rigid tippers may be used for smaller orders.
– It is anticipated that during extraction periods there will be a maximum of 15 loads per day;
– All loads will be covered or wetted before leaving the site, and a water cart will be on site whenever the pit is worked;
– There is no process waste material. Topsoil and overburden will be retained on site and reused to rehabilitate the cell that they came from;
– The applicant has advised that the nearest sensitive premises (house) is approximately 1.3 kilometres south of the proposed extraction area;
– No blasting is proposed.
In support of the application the proponent has lodged a detailed written submission, environmental and operation plan, photographs of machinery, a geotechnical report, and various plans/figures which can be viewed here.
Prior to determining this application, the Shire would like to provide the general public and key stakeholders with the opportunity to comment on the proposal.
Should you wish to make a public submission on the proposal, your comments (in writing) will need to be lodged within 21 days by 15 December 2026. Government authorities are provided with a longer time period to provide advice to the Shire.
Please note, if no comments are received by the closure date, we will assume that you have no comment you wish to make and the application will be assessed and determined on its merits and without any further consultation.
Should you have any queries relating to the proposed application, please do not hesitate to contact the Shire’s Planning consultant, Ms Liz Bushby on 0488910869 between Tuesday and Thursday’s.
Peter Fitchat
CHIEF EXECUTIVE OFFICER